The long road to a finished Davrian Mk 7

The long road to a finished Davrian Mk7

A few years ago, I started to work on the car again - first there was a lot of work put into repairing the body, then the new bodyparts and the paintwork.

My aim is to have it ready for racing, but I have not made a time table - it have to take the time it takes to get it ready.....



Sunday, January 30, 2011

All black under the car..
Some black paint....
And now I have a dash top...

Half way there.....
Manufactoring of a new dash top - by using building foam

New phase - THE ASSEMBLY !!!!

Inventory of all suspension parts - they had been painted 10 years ago - now it is just a matter of cleaning them + I need to get some new bushes etc.
January 2011

First part ready from the paint shop
end of 2010

New paint !!

I left the car to the paint shop - we made an agrement that it was not urgent to have it painted - it would take as much time as needed....
I had put at lot of thoughts into what colour to choose  - first I decided to choose a light colour, a darker one would show uneven areas more. A lot of mk7's were white at the time, mine had been white, blue and then red. In the end I choose a colour from Lotus called Burnt Orange. A nice (and expensive) 2 tone orange colour.....
On it's way to the paintshop....
March 2010
To the paint shop
March 2010
To the paint shop
March 2010
To the paint shop
March 2010
To the paint shop
March 2010
To the paint shop
March 2010
To the paint shop
March 2010
To the paint shop
March 2010
To the paint shop
March 2010
To the paint shop
March 2010

To the paint shop

Ready for the paint shop !!
March 2010

Saturday, January 29, 2011

The other door
end of 2009
Other side......
end of 2009
A lot of cooling fans behind the air intake...
end of 2009
Support bracket for the front end
end of 2009
It took some time to make the front end fit with the doors
end of 2009
end of 2009
A dusty radiator
end of 2009
The radiator was reconditioned with a larger element - I had to modify the brackets + that the new front end is a little bit lower than the older one.
end of 2009
Rear end
end of 2009
The KN-filter fits nicely - a nice view for the people behind me on the race trac !!
end of 2009
Fitting of rear end
end of 2009
Fitting of the rear end plus the engine cover - I had to put the engine and gearbox into the car in order to position the carburetter air intake duct correctly.
end of 2009

Thursday, January 27, 2011

Next work on the Davrian

Nothing happened on the car until the second half of 2009. The time consuming work with fitting all the new parts and adjusting the old ones took almost half a year (not full time work, but every now and then)....

New bodyparts.

I decided that the old front and rear end was in too bad condition - I wanted new parts!. In the end of 2006 I travelled to Wales to Team Duffee Engineering, had a very good and interesting meeting. I ordered: a front end, a rear end, a bonnet, an engine cover and some seats. They arrived in Sweden in the beginning of 2007 !!!

Summer of 2006

The pictures below shows the work carried of in summer of 2006. The underside of the body was repaired. The engine bay was in bad condition and it was repaired and reinforced. All paint was removed.
Summer 2006
Lot of dust everyware....
Summer 2006
Summer 2006

Wednesday, January 26, 2011

Summer 2006
Summer 2006

Many layers of paint

Summer 2006
Summer 2006
Summer 2006

A Mk7A rear end - that had been used on the car 89-95

Summer 2006

Lightweight - but doesn't fit that well...

The old modsports rear end...

It fits well - but it is very wide!
Summer 2006

The old modsports rear end

It was used when the car was new.
Summer 2006

Modsports rear end.....

Summer 2006

On the side...

It is nice to have a light weigt car...
Summer 2006

Underside ready
Summer 2006